How long does a remodel actually take?

By Darrin Coffin, President, Sunterra Builders

Published October 27, 2026 · 2 min read

Interior of a home under construction, with exposed wood framing and open studs

Most people asking how long a remodel takes are picturing construction. Construction is the second half.

The first half — design, selections, engineering, permits — routinely takes as long as the building does, and it's the half where you control the schedule. Once demolition starts, your ability to speed things up mostly disappears.

The short answer

We don't publish a typical duration, for the same reason we don't publish a typical cost: a bathroom refresh and a whole-house gut are not the same animal, and quoting an average would mislead you about yours. What we can tell you is the shape of the schedule and where it goes wrong, which is more useful than a number you'd have to discount anyway.

The part before construction

Four things happen before a crew arrives, roughly in order:

  1. Design. Drawings developed with your architect or designer until the scope is genuinely settled.
  2. Selections. Tile, cabinetry, stone, fixtures, hardware, appliances. This is where owners underestimate the effort, and it's on the critical path more often than anything else.
  3. Engineering, where structure changes.
  4. Permits and plan check. Duration depends on the jurisdiction and on whether your drawings are complete. See what triggers a permit.

None of this is glamorous and all of it is cheaper to get right than to fix later.

Where schedules slip

  • Selections made late. A tile chosen in week two is a schedule item. The same tile chosen in week ten is a stoppage — and the one with a twelve-week lead time is a stoppage either way if nobody asked.
  • Long-lead items ordered late. Custom cabinetry, large glass door systems and specialty appliances have lead times measured in months. Order them against the drawings, not against the install date.
  • What's behind the wall. In an older house, demolition reveals things nobody drew. This is what the contingency is for.
  • Changing your mind mid-build. The single most expensive thing you can do to a schedule, because it often unwinds work that's already done.
  • Inspection sequencing. Some work can't proceed until an inspector signs off on what's underneath it.

The desert calendar

Two local factors that don't apply elsewhere. Trade availability tightens through season, when the valley's population swells and everyone wants work finished before guests arrive. And summer heat changes how some work gets sequenced — concrete in particular, which we covered in how summer heat changes how your home gets built.

Neither is a reason to avoid a season. Both are reasons to build a schedule that admits they exist.

How to actually go faster

Finish the drawings before demolition. Make your selections early and in writing. Order long-lead items as soon as the drawings support it. Set a contingency so a surprise is an inconvenience rather than a stoppage. Then leave the plan alone.

That's genuinely the whole list, and every item on it happens before construction starts. A builder who tells you a fixed duration before seeing your drawings is guessing, and you'll pay for the guess later.

Our process is built to front-load these decisions rather than discover them in the field. If you want a real schedule for your project rather than an average for somebody else's, tell us about it and we'll walk the house with you.

Frequently asked questions

How long does a home remodel take from start to finish?

It depends far more on scope than on square footage, and the design, selections and permitting phase often takes as long as construction. A surface-level refresh and a whole-house gut with structural changes sit at opposite ends of a very wide range, so any single average would mislead you.

How long does the design and permit phase take?

Long enough that it belongs in your plan as a real phase, not a formality. It covers drawings, selections, engineering where structure changes, and plan check at the city. The main thing you control is submitting complete drawings the first time.

What causes remodel delays most often?

Late selections and late orders for long-lead items like custom cabinetry and large glass door systems. After that: surprises behind the walls in older homes, mid-build changes of mind, and inspection sequencing where one trade can't start until another is signed off.

Can I live in the house during a remodel?

For a one or two room project, usually yes, with dust barriers and a temporary kitchen. For a whole-house remodel the systems get shut down and most rooms are open at some point, so most owners move out. That's part of why doing it all at once is easier than repeating it three times.

Is it faster to remodel in summer or winter in the Coachella Valley?

Neither reliably. Trade availability tightens through season when demand peaks, and summer heat changes how some exterior work is sequenced. A realistic schedule accounts for whichever one applies rather than pretending the calendar is neutral.

↑ Back to top

About the author

Darrin Coffin is the president, sunterra builders and a Palm Springs native. He has built across the Coachella Valley since 2007 and stays hands-on from the first walkthrough to the final punch list. More about Darrin →

Planning a build or remodel in the Coachella Valley?

Start a ProjectCall (760) 702-5772

Keep reading

How much does a home remodel cost in the Coachella Valley?

Published guides put a Southern California home remodel at $100 to $400 per square foot. Here's what those numbers are made of, what the desert adds, and which part of the average is lying to you.

Do I need a permit to remodel in the Coachella Valley?

Most remodels that touch structure, electrical, plumbing or the building envelope need a permit. Here's what triggers one, what doesn't, and why unpermitted work costs more later.

Mid-century remodels: work with the architecture, not against it

Palm Springs mid-century homes reward restraint and punish renovation trends. What to keep, what to quietly upgrade, and when the honest answer is to buy a different house.